WHAT IS INCLUDED IN THESE BUDGETS
planning design, all required labor, materials, flooring, cabinets & hardware, countertops, painting, plumbing fixtures, light fixtures, bath accessories, frameless shower system and mirrors.
NOT included: Smoke detector upgrade or electrical panel upgrades if required by code
On the pricing charts below the “Basic“, “Mid” & “Upper” levels are determined by size and the finishes you choose.
Master Bathroom
Basic Level
$40k-$50k
100 to 150 s.f.
- Replace Existing Tub & Shower Base with New Fiberglass Tub & Shower Base (Keep Existing Sizes & Locations)
- Porcelain Tile Floor & Shower Walls
- Level 2 Plumbing Fixtures
- Level 2 Vanity Cabinetry
- Granite/Quartz Remnant Top
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures Remain in the Same Locations
Medium Level
$50k-$75k
150 to 250 s.f.
- Remove Existing Tub & Shower. Expand Existing Shower with Mudbase Tile Shower (Tub is Not Included)
- Porcelain Tile Floor, Shower Base & Walls
- Level 3 Plumbing Fixtures
- Level 3 Vanity Cabinetry
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Limited Fixture Movement
Upper Level
$75k-$110k
200 to 300 s.f.
- Remove Existing Tub & Shower. Install New Tub, Expanded Mudbase Tile Shower with Seat
- Natural Stone Floor, Shower Base & Walls
- Level 4 Plumbing Fixtures
- Level 3 Vanity Cabintry w/Linen Cabinet
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures May be Moved

hall Bathroom
Basic Level
$18k-$22k
50 to 80 s.f.
- Keep Existing Tub
Ceramic Tile Floor & Shower Walls - Level 1 Plumbing Fixtures
- Level 1 Vanity Cabinetry
- Level 1 Granite Remnant Top
- Electrical Updates
- Shower Door NOT Included
- Fixtures Remain in the Same Locations
Medium Level
$22k-$32k
75 to 100 s.f.
- Replace Existing Tub with Tub or Fiberglass Shower Base
- Porcelain Tile Floor & Shower Walls
- Level 2 Plumbing Fixtures
- Level 2 Vanity Cabinetry
- Granite/Quartz Remant Top
- Electrical Changes/Updates
- Shower Door NOT Included
- Fixtures Remain in the Same Locations
Upper Level
$32k-$40k
85 s.f. to 120 s.f.
- Remove Tub & Replace with Tile Base Shower
- Porcelain or Natural Stone Tile Floor & Shower
- Level 3 Plumbing Fixtures
- Level 3 Vanity Cabinetry
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures May Be Moved